Before we could go and Film our sequence that is going to be used for our trailer. We needed to get some of our production work done first.
Below is the link to our Risk Assessment for the location which we filming at as well as any risks getting there and whilst being there.
https://drive.google.com/open?id=1MuhmVOLgX4mgPENAdwblQOhDg225Urtrw7GIS2yNEaw
We also needed a location Reece done of where we were filming. This was done at the same time as the Risk assessment. Below is the link to the Location Reece.
https://drive.google.com/open?id=13hZjcIZVSSEHFlbKEZzUHvwhGxLmqBFGnLhg8eslPnQ
The last pre-production thing we needed to do was a shot list table. We made this after Nikol had finished the Script for the sequence. I then read the script and went through all the shots we would need to do with her. You can view a .PDF of my annotated script here, unfortunately the scanner did scan the document in the wrong order.
https://drive.google.com/open?id=0B_wtyewGWwp_VzNvS0lqd0lkWTA
The shots list I also put together on another document on Google Drive which can be viewed here.
https://drive.google.com/open?id=1odEnOEvbpZQRl-tEDykcFBDohmdfnBQcWT56ljo0HZk.
On the shooting schedule it lists all the shots we were planning to do as well as the charterers that were required for that shot.
After the shooting schedule was completed it meant me and Nikol were ready to begin the filming of the scene for our trailer. Luckily we got all the pre-production and planning before the production date we booked the equipment for (10th May 2016). We got all the people we needed for the trailer and headed over to the filming location that evening